Skip to main content

Power BI

Needs Votes

Timeline control period selector

Vote (3) Share
's profile image

on 12 Apr 2016 23:01:23

The timeline's selector of Y/Q/M/W/D should be flexible so that is can be hidden or only include say Y/Q/M if the lowest level in the data is month. Also it would look better in the top-right.

Comments (1)
's profile image Profile Picture

ZLJ on 05 Jul 2020 22:22:13

RE: Timeline control period selector

Agree. I often only want to select at D level, but it seems to default to M when the report is opened.