Bryon Brown on 13 Apr 2019 00:41:21
I have 50 report tiles that can be drill through on. They are organized by number. However there is no mechanism in place that allows for ordering the drill through options so that you can anticipate which drill through items should be prioritized (i.e., at the top of the list.