Geo on 17 Aug 2017 21:59:12
It would make my life a lot easier if I could copy a visualization and change the underlying data. As it is now, I can copy a visualization, but then I have to go in and change each field by hand if I want it to point to a different table. I'm working with very similar sets of data with a lot of the same fields, and I have a report tab for each table.